Monitoring/
Documentation
We guide your refit process, every step of the way.
WHY WREDE CONSULTING?
- We make every effort to continually monitor contractual compliance onboard
- We supplement the refit with individually thought-through solutions, where tried-and-trusted techniques have failed
- We ensure that the results of the monitoring flow back into the work process
WHAT WE DO
- Monitor and document the construction of the shell for a new build
- Supervise the steel dressing and coating steps
- Consistently monitor the work, schedule and materials flow
- Check constantly to ensure correct climatic conditions
WREDE CLIMATIC MONITORING
- Collecting data from various strategic measuring points on the yacht
- Transmission of collected data to a central computer
- Assessment and documentation by WREDE software
- Determining the correct time window for application
Your steps to a perfect refit coating of your superyacht
Your Idea
CONTACT WREDE CONSULTING
Docking
START OF WORK
PREPARATION / SCAFFOLDING
Filling/Fairing
PRiming/Coating
Handover
Operation
AFTER ONE YEAR
After Following Years
Status Survey